Loading…
← CockpitCompetitor Analysis › JKIL.NS J. Kumar Infraprojects LimitedOpen in the cockpit ↗

J. Kumar Infraprojects LimitedJKIL.NSCompetitor analysis, valuation and peers

India · INR·Construction & Infra›Engineering & Construction
Momentum weak 21
Mkt cap
$331M
US dollars, full cap
Free float
51%
of shares outstanding
$/day
$483,706
20-day average traded
Fwd P/E
7.1×
forward earnings
ROIC−WACC
+1.3 pp
WACC 12.5%
Hurdle
-19 pp
Req g minus delivered
Next earnings
7 days
13 Nov 2026
Close · INR₹414.40
1D-1.5%
1W+2.2%
1M-6.3%
3M-15.7%
6M-20.0%
YTD-28.9%
1Y-36.5%
ATR %3.5%
Beta0.95
52w lowhigh38.3% off high

What J. Kumar Infraprojects does

Employees: 6,955

J. Kumar Infraprojects at a glance

Size J. Kumar Infraprojects (JKIL.NS) is an India Industrials company (Engineering & Construction) with a market value of $331M, the 1013th largest of 1,058 India companies the cockpit tracks. Shares closed at ₹414.40 on 6 Nov 2026.

Performance Over six months the shares fell 20.0%, against -17.3% for the median peer and 0.0% for the India market (cap-weighted) — 8th lowest of 20 in its peer set.

Growth Revenue fell 2.5% over the last twelve months (peer median +10.3%); the operating margin is 10.8% (peer median 6.2%).

Valuation It trades at 7.1× forward earnings against a peer median of 14.5× (cheapest of 10).

Price implies For today's price to make sense, revenue must grow about -2% a year for seven years (Req g). Recent delivered growth is +17%, so the hurdle is -19 pp: the price already allows for a slowdown.

Capital Return on invested capital runs 1.3 points above its cost of capital (12.5% WACC).

Next results Next results expected around 13 Nov 2026 (exchange calendar; dates can move).

Relative performance

809010011 May 202611 Aug 20266 Nov 2026Peer median 83JKIL.NS 81
Six months, rebased to 100: J. Kumar Infraprojects against the median of its 20 peers (local-currency closes).

J. Kumar Infraprojects financials

Reported figures in INR; fiscal year ends 2026-03-31. TTM = trailing twelve months.
TTMFY2025FY2024FY2023FY2022
Revenue₹57.5B₹57.2B₹56.9B₹48.8B₹42.0B
Revenue growth—+1%+17%+16%—
Gross profit₹7.19B₹7.06B₹7.48B₹6.18B₹4.98B
EBITDA₹8.21B₹8.33B₹8.34B₹7.09B₹6.01B
Net income₹3.81B₹3.87B₹3.91B₹3.31B₹2.74B
Free cash flown/a₹2.76B₹3.87B₹862M-₹957M
Capital expendituren/a₹4.69B₹2.35B₹2.18B₹2.32B
Total debtn/a₹6.21B₹7.04B₹5.93B₹5.47B

Quarterly statements and history in the cockpit →

J. Kumar Infraprojects competitor charts

The default views of Competitor Analysis ▸ Charts, drawn from the same data. Open them in the cockpit to change the axes, pin companies and read every value.

Performance: 6-month against 1-month return

-50%-25%0%+25%+50%-20%-10%0%CAPDPSPPROJECTKNRCON0005481945603176DUR1793MRB1898603017DRX603183603909600463TRK603797JKIL.NS6-month return →1-month return →
Up and to the right = strong over both horizons. J. Kumar Infraprojects is the large dot.

Fundamentals: revenue growth against valuation

-40%-20%0%+20%+40%10×15×20×CAPDPSPPROJECTKNRCON1945DURMRBDRX603183603909JKIL.NSRevenue growth (TTM) →Forward P/E →
Further right = faster growth; higher = more expensive. The dashed lines are the peer medians. J. Kumar Infraprojects is the large dot.

Capital: growth delivered against growth the price implies

0%+20%+40%+60%0%25%50%CAPDPSPPROJECTBONDADA1945DUR1898603017DRX603183TRK603797JKIL.NSGrowth delivered (Del g) →Growth the price implies (Req g, 7 yrs) →
Above the diagonal = the price needs more growth than the company has been delivering; below = the price already allows for a slowdown. J. Kumar Infraprojects is the large dot.

J. Kumar Infraprojects competitors and peer comparison

How J. Kumar Infraprojects compares with its peers

Peer set: Industry: the same industry and sector in any market, nearest in size. This is the same default set the interactive Competitor Analysis opens with.

J. Kumar Infraprojects against its 20 peers (data as of 6 Nov 2026)
MeasureJKIL.NSPeer medianRank in peer set
1-month return-6.3%-10.4%8th highest of 20
6-month return-20.0%-17.3%8th lowest of 20
Distance from 52-week high-38.3%-32.2%7th lowest of 20
Revenue growth (TTM)-2.5%+10.3%7th lowest of 21
Operating margin10.8%6.2%7th highest of 21
Forward P/E7.1×14.5×cheapest of 10
Growth the price implies (Req g, 7 yrs)-2.1%3.0%5th least demanding of 12
Growth delivered (Del g)+17.4%+10.9%5th highest of 12
Hurdle (Req g minus delivered)-19.5 pp-14.7 pp4th least demanding of 12
ROIC minus cost of capital+1.3 pp-1.1 pp8th highest of 20
EV / EBITDA3.8×8.0×2nd cheapest of 11
Net debt / EBITDA-0.1×-0.4×6th most indebted of 13

Peer table

Peer set: Industry: the same industry and sector in any market, nearest in size
CompanyMarketMarket cap6M returnRevenue growthOp. marginForward P/EReq gDelivered g
J. Kumar Infraprojects JKIL.NSIndia$331M-20%-2%11%7.1×-2.1%+17.4%
Capital CAPD.LUnited Kingdom$329M-4%+16%15%9.8×-4.9%+20.0%
PSP Projects PSPPROJECT.NSIndia$333M-7%+45%4%20.9×29.2%+20.5%
Bondada Engineering BONDADA.NSIndia$327Mn/a+202%11%n/a20.0%+58.2%
KNR Constructions KNRCON.NSIndia$327M-19%-38%25%22.2×n/an/a
Hunan Investment 000548.SZChina$326M-18%-19%19%n/an/an/a
Tokyo Energy & Systems 1945.TJapan$326M-10%+29%6%10.4×3.0%+6.9%
Huitong Construction 603176.SSChina$340M-14%-24%5%n/an/an/a
Duratec DUR.AXAustralia$341M-28%0%5%14.5×4.6%+19.3%
Ohmoto Gumi 1793.TJapan$320M+15%+36%4%n/an/an/a
Mirbud MRB.WAPoland$319M+10%+6%4%10.3×n/an/a
Seikitokyu Kogyo 1898.TJapan$318M-4%-5%7%n/a-15.2%+1.1%
ARTS 603017.SSChina$345M-46%-10%9%n/a-0.2%-8.5%
ADF DRX.TOCanada$346M+62%+30%14%12.8×-15.6%+8.4%
Suzhou Institute of Building Science 603183.SSChina$347M-3%-6%7%21.1×10.1%+0.2%
C and D Holsin Engineering Consulting 603909.SSChina$348M-27%+23%2%18.8×n/an/a
Beijing Airport High-Tech Park 600463.SSChina$314M-35%+15%-9%n/an/an/a
Trakcja TRK.WAPoland$350M-23%-2%7%n/a-6.6%+10.9%
Shanghai Trendzone 603030.SSChina$350M-33%+28%-18%n/an/an/a
Guangdong Liantai Environmental Protection 603797.SSChina$351M-17%+2%37%n/a3.5%+11.3%
Fujian Newchoice Pipe Technology 300198.SZChina$311M-21%+37%-154%n/an/an/a

Questions

Which companies are J. Kumar Infraprojects's closest peers?
The cockpit's peer set: Capital (CAPD.L), PSP Projects (PSPPROJECT.NS), Bondada Engineering (BONDADA.NS), KNR Constructions (KNRCON.NS), Hunan Investment (000548.SZ), Tokyo Energy & Systems (1945.T), Huitong Construction (603176.SS), Duratec (DUR.AX).
Is J. Kumar Infraprojects expensive compared with its peers?
On forward p/e it trades at 7.1× against a peer median of 14.5×, cheapest of 10 in its peer set. For today's price to make sense, revenue must grow about -2% a year for seven years (Req g). Recent delivered growth is +17%, so the hurdle is -19 pp: the price already allows for a slowdown.
How has J. Kumar Infraprojects stock performed?
Over six months to 6 Nov 2026 the shares returned -20.0% against -17.3% for the median peer; over one year -36.5%.

How these numbers are made. Returns are close-to-close in local currency. Revenue growth and margins are trailing twelve months. Req g is the revenue growth that today's enterprise value requires for seven years at the company's own cost of capital; Delivered g is what it actually grew; the gap is the hurdle (honest precision about ±8 points, so read the ranking more than the decimal). No fair values, price targets or analyst ratings are shown, by design. Method and validation.